CosmoDirector – Space Mission Control Simulator
Current status: Version 0.10.0
More info here: Cosmodirector Plugin Article
—
TRY IT!
(It’s higly reccomended to click on FULL SCREEN view!)
COSMODIRECTOR
SPACE MISSION CONTROL
MISSION NOT LOADED/SAVED
MISSION AUDIO
SIM PAUSED● SYSTEM ONLINE
PHASE 01 / DEFINE MISSIONMission architect
T−18D 04:22:00
MISSION FAMILY1 / 4
MISSION PARAMETERSLEO NETWORK
TARGET ORBITCOMPATIBLE
LEO / CIRCULAR
N 0.0° · W 55.0°
LOADING EARTH MODEL…
DRAG TO ROTATE
T+ 00:00:00
ORBITAL PERIOD 95.5 MIN
PAYLOAD
ORBITAL VELOCITY
COMPATIBILITY
LAUNCH SITE NETWORKFILTERING…
Sites are ranked against the target inclination and range corridor.
© OPENSTREETMAP CONTRIBUTORS
COORDINATES
ELEVATION
ORBIT ACCESS
RANGE / PADS
LIVE WEATHER · OPEN-METEOCONNECTING…
TEMP —
WIND —
GUSTS —
CLOUD —
Waiting for launch-site telemetry.
PHASE 02 / MATCH VEHICLEVehicle integration
GO
LAUNCH VEHICLESELECT 1 / 3
VEHICLE STACKLIGHT LIFT
STAGES2
CONFIGURATIONRECOVERABLE
RATINGUNCREWED
MISSION MATCHGO
AQUILA
LIGHT LIFT LAUNCH SYSTEM
MISSION REQUIREMENTVEHICLE CAPABILITY
Payload4,280 kg6,400 kg
Target orbit550 km≤ 1,200 km
Inclination53.2°≤ 98.7°
PAYLOAD MARGIN
PROPELLANT MARGIN
STRUCTURAL MARGIN
PHASE 02B / HUMAN SPACEFLIGHTCrew manifest
REVIEW
AURORA CREW CABINSEAT MAP
COMMANDER
ASSIGNED
MISSION SPECIALIST 1
STANDBY
MISSION SPECIALIST 2
STANDBY
MISSION SPECIALIST 3
STANDBY
PHASE 03 / FINAL SYSTEM POLLMission readiness review
NO-GO
CONTROL ROOM STATIONSLIVE POLL
PHASE 04 / TERMINAL COUNTCountdown & launch operations
READY
LAUNCH CLOCKRR-00000000
T−00:10:00
0% COMPLETE
VEHICLEGO
GROUNDGO
RANGEGO
WEATHERGO
PAYLOADGO
ACTIVE CONDITIONNOMINAL
No launch constraints
Terminal-count systems are ready for the Mission Director command.
PAYLOAD TELEMETRYNOMINAL
SATELLITE SYSTEMSPayload health
LINK LOCKED
LIVE · PAYLOAD BAY CAM 02
T−00:10:00
SIGNAL 98%
VEHICLE STATUSGO
HEAVY LIFT
TITAN
UNCREWED LAUNCH SYSTEM
PAYLOAD4,280 KG
PROPELLANT MARGIN12.0%
STRUCTURAL MARGIN10.0%
COMMIT SEQUENCEAUTOMATED
MISSION DIRECTOR LOG
- Terminal count loaded and awaiting start command.
PHASE 05 / ASCENTFlight & orbital insertion
ASCENT
ASCENT VISUAL MISSION CAMERA
CAM 01LAUNCH RANGE / PAD TRACKER
LIFTOFF
PAYLOAD
STAGE 02 · ORBIT INSERTION
STAGE 01 · ASCENT
CAM 02VEHICLE / STAGING MODEL
AQUILA
LIVE GROUND TRACKLEO / CIRCULAR
550 × 550 KM · 53.2°N 0.0° · W 55.0°
PHASE 06 / ON-ORBITOrbital operations
ORBIT ACQUIRED
ORBITAL TIMELINEACQUISITION
RELATIVE SEPARATION
0.0 M
0.00 M/S
LIVE · DEPLOYMENT CAM 02PAYLOAD SECUREDT+00:00:00
NEXT DEPLOYMENT WINDOWCALCULATING
NEXT GROUND CONTACTCALCULATING
AURORA ORBITAL TIMELINEACQUISITION
VEHICLEAURORACREW NOMINAL
PROGRAM WINDOWNOT REQUIRED
CABIN STATUSCONFIGURING
MISSION AUDIO
SIM PAUSED● SYSTEM ONLINE
PHASE 01 / DEFINE MISSION
Mission architect
T−18D 04:22:00
MISSION FAMILY1 / 4
MISSION PARAMETERSLEO NETWORK
TARGET ORBITCOMPATIBLE
LEO / CIRCULAR
LOADING EARTH MODEL…
DRAG TO ROTATE
T+ 00:00:00
ORBITAL PERIOD 95.5 MIN
PAYLOAD
ORBITAL VELOCITY
COMPATIBILITY
LAUNCH SITE NETWORKFILTERING…
Sites are ranked against the target inclination and range corridor.
© OPENSTREETMAP CONTRIBUTORS
COORDINATES
ELEVATION
ORBIT ACCESS
RANGE / PADS
LIVE WEATHER · OPEN-METEOCONNECTING…
TEMP —
WIND —
GUSTS —
CLOUD —
Waiting for launch-site telemetry.
PHASE 02 / MATCH VEHICLE
Vehicle integration
GO
LAUNCH VEHICLESELECT 1 / 3
VEHICLE STACKLIGHT LIFT
STAGES2
CONFIGURATIONRECOVERABLE
RATINGUNCREWED
MISSION MATCHGO
AQUILA
LIGHT LIFT LAUNCH SYSTEM
MISSION REQUIREMENTVEHICLE CAPABILITY
Payload4,280 kg6,400 kg
Target orbit550 km≤ 1,200 km
Inclination53.2°≤ 98.7°
PAYLOAD MARGIN
PROPELLANT MARGIN
STRUCTURAL MARGIN
PHASE 02B / HUMAN SPACEFLIGHT
Crew manifest
REVIEW
AURORA CREW CABINSEAT MAP
PHASE 03 / FINAL SYSTEM POLL
Mission readiness review
NO-GO
CONTROL ROOM STATIONSLIVE POLL
PHASE 04 / TERMINAL COUNT
Countdown & launch operations
READY
LAUNCH CLOCKRR-00000000
T−00:10:00
0% COMPLETE
VEHICLEGO
GROUNDGO
RANGEGO
WEATHERGO
PAYLOADGO
ACTIVE CONDITIONNOMINAL
No launch constraints
Terminal-count systems are ready for the Mission Director command.
PAYLOAD TELEMETRYNOMINAL
SATELLITE SYSTEMS
LINK LOCKED
Payload health
LIVE · PAYLOAD BAY CAM 02
T−00:10:00
SIGNAL 98%
VEHICLE STATUSGO
HEAVY LIFT
TITAN
UNCREWED LAUNCH SYSTEM
PAYLOAD4,280 KG
PROPELLANT MARGIN12.0%
STRUCTURAL MARGIN10.0%
COMMIT SEQUENCEAUTOMATED
MISSION DIRECTOR LOG
- Terminal count loaded and awaiting start command.
PHASE 05 / ASCENT
Flight & orbital insertion
ASCENT
ASCENT VISUAL MISSION CAMERA
PAYLOAD
STAGE 02 · ORBIT INSERTION
STAGE 01 · ASCENT
LIVE GROUND TRACKLEO / CIRCULAR
550 × 550 KM · 53.2°N 0.0° · W 55.0°
PHASE 06 / ON-ORBIT
Orbital operations
ORBIT ACQUIRED
ORBITAL TIMELINEACQUISITION
RELATIVE SEPARATION
0.0 M
0.00 M/S
NEXT DEPLOYMENT WINDOWCALCULATING
NEXT GROUND CONTACTCALCULATING
AURORA ORBITAL TIMELINEACQUISITION
VEHICLEAURORACREW NOMINAL
PROGRAM WINDOWNOT REQUIRED
CABIN STATUSCONFIGURING